Power Control Room includes:
  • $27 Million Dollars Worth of Electrical  Equipment
  • 15 Control Panels - From 96" x 72" to
    96" x 120"
  • Controlling 1200 instruments from thermal couples to flow switches to temperature switches
  • 85 Isolation Transformers
  • 85 Variable Speed Drive Panels
  • 16 Operator Stations
  • 80,000 Man hours to install without a lost time incident

Jp277.jpg (61810 bytes)

Galvanized Rolled Steel manufactured on Galvanizing Line 2

Jp310.jpg (55662 bytes)

Four Motor Control Center Panels -
96" x 72" to 96" x 120" controlling over
200 motors from 3/4 hp to 500 hp

Jp314.jpg (61323 bytes)

Jp312.jpg (66808 bytes)

Jp295.jpg (62108 bytes)

Jp311.jpg (62940 bytes)

1) Cable Tray Systems
  • 3,000 linear feet of cable tray
  • 40,000 feet of Conduit 
  • 500,000 feet of Wire and Cable

Jp305.jpg (55680 bytes)

One of nine installed substations

Jp299.jpg (62102 bytes)

Photo Illustrates Controls for Heavy Industrial Installation of 85 Variable Speed Drives