Colton City Power

Colton, CA

City of Colton Power.

Johnson-Peltier Electrical with the help of several subcontractors, installed eight (8) General Electric 10-Megawatt Combustion Turbine Generation units, for the City of Colton. Black and Veatch engineered and managed
the overall project for Alliance Century Project and the City of Colton. The turbines were installed at two sites in the City of Colton, California simultaneously, four (4) at the Drewssite and four (4) at the Century site.
The following is a list of equipment installed during construction.

Alliance Century Project: A 40-megawatt simple cycle project consisting of four, 10-megawatt, gas turbine generators. The project, by Alliance Colton LLC, is located in the City of Colton at the existing Century Substation in San Bernardino County. The facility is part of the Independent System Operator’s reliability generation agreement.

Alliance Drews Project: A 40-megawatt, simple cycle project consisting of four, 10 megawatt, gas turbine generators. The project, by Alliance Colton LLC, is built in the City of Colton at the existing DrewsSubstation in San Bernardino County. The facility is part of the Independent System Operator’s reliability generation agreement.