CRC Gerald Desmond Bridge Project

Long Beach, CA

Gerald Desmond Bridge Terminal Island Electrical Relocation Project.

Johnson-Peltier was tasked with the relocation of existing underground utilities and switchgear to accommodate the new Long Beach to Terminal Island Bridge. This project involved a 48 hour shutdown of terminal island in which Johnson-Peltier demolished existing equipment and changed over (4) new substations. During this project Johnson-Peltier installed the following:

  • 20 miles of cable and conduit
  • (1) 7500 KvATransformer 15 Kvto 4160 volt
  • (4) 1500 Kva12.47 Kv-480 volt Transformers
  • (4) 3200 amp 480 volt Switchgears