Irvine Ranch Water District

Eastwood Recycled Water Pump Station – $2.35M

Completed in November 2020

IRWD constructed a 6,800 square-foot pump station to enhance the District’s recycled water delivery systems.

Johnson-Peltier was contracted for a ground up installation including:

  • Power Distribution
  • Switchboards, MCC’s, PLC’s,
  • Generator Connection Board
  • Panelboards
  • Lighting
  • Instrumentation
  • Grounding
  • SCE Service Install
  • Over 180 4” RSC Stub-Ups
  • Over 240 1” RSC Stub-Ups