JPL Goldstone Complex

Fort Irwin, CA

JohAirborne Toxic Control Measures (ATCM) Power Task & G86 Power Distribution.

  • Furnish and install 4 Megawatt site wide UPS
  • G91 Synchronizing Switchgear Replacement
  • G81 Generator Switchgear Replacement
  • Replace Paralleling Switchgear
  • Retrofit of Existing Generators

The Mars Project: Curiosity cost $2.5 Billion from conception through creation, launch to landing, and all communication systems. Johnson-Peltier was the chosen electrical contractor to install the most reliable electrical and emergency power supply system powering the Curiosity Project Antennas centered at the Goldstone desert complex in California.