Miller Brewery B3-B4 Lines

Irwindale, CA

B3/B4 Consolidation.

Johnson-Peltier was responsible for the removal, relocation, and installation associated with the B3/B4 Consolidation Project which included:

  • Installation of the B4 Line with dual back end capability through the relocation of the existing B3 Jones/Nigrellipacker cell
  • Installation of two new Standard Knapp drop converted to run bulk glass
  • Installation of new full case conveyors
  • Complete demolition of the filler room structures that housed the existing B4 filler, including receptacles, lighting, communication wiring, camera and video display equipment which involved a successful major shutdown.